You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
International Procurement Instrument Measures concept exists only in result phase based on eForms annex (2023 version) and in eForms SDK 1.13 it is at the level of the Lot, which means it appears in competition phase.
If indeed we need this indicator in competition phase, a boolean attribute at the level of the epo:ProcurementElement called epo:appliesInternationalProcurementInstrumentMeasures should be added.
The text was updated successfully, but these errors were encountered:
International Procurement Instrument Measures concept exists only in result phase based on eForms annex (2023 version) and in eForms SDK 1.13 it is at the level of the Lot, which means it appears in competition phase.
If indeed we need this indicator in competition phase, a boolean attribute at the level of the epo:ProcurementElement called epo:appliesInternationalProcurementInstrumentMeasures should be added.
The text was updated successfully, but these errors were encountered: