Indicator Migration

Table of Contents

1. Overview

  • This section describes about the Indicator Migration tool, the APIs & processes involved in migrating indicators from an ASPM (or) PAI system to APM (sIOT) or APM (eIOT).
  • Data is extracted from the source system, transformed and then loaded into APM.
  • The extraction of data from the source, uses APIs from the Business Network Asset Collaboration (or) Asset Central Foundation (ACF) to connect to the source system.
flowchart LR
    classDef element fill:#fff,color:#000,stroke:none,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;
    classDef teal fill:#2CE0BF, color:#012931, stroke:#012931;
    classDef grey fill:#A9B4BE, color:#12171C, stroke:#12171C;

    im1(("Source System"))
    m1("Extract & Stage")
    m2("Transform")
    im2("User Decision Report")
    im3("Configuration / Master Data")
    im4("Indicators")
    m3("Load")

    im5[("Database")]

    m1 ==> m2 ==> m3
    im1==1==> m1
    m2==2==> im2
    im2==3==> m2
    m3==4==> im3
    m3==5==> im4

    m1<-.->im5
    m2<-.->im5
    m3<-.->im5

  class im1,m1,m2,im2,im3,im4,m3,im5 element;
  class m1,m2,m3 blue;
  class im1 mango;
  class im2 teal;
  class im3,im4 green;
  class im5 mango;
Loading
  • Step 1: Extract & Stage the data from the source system (PAI) or ASPM.
  • Step 2: A User Decision Report (UDR) is generated based on the extracted data which contains certain proposals by the tools
  • Step 3: User reviews the proposals (and accepts) or has the provision to input values. This data from the UDR is considered for transformation.
  • Step 4: Based on the UDR, necessary configuration or master data is created in the specific systems
  • Step 5: Once configuration/master data is loaded, indicators are loaded into APM.

2. Limitations & Assumptions

External IDs for Technical Objects

  • There is a possibility that one technical object (equipment or functional location) maybe assigned with multiple external IDs in the source system
  • This is currently not supported for migration.
  • Assumption: During migration we assume that there will be only one External ID assigned to a technical object (1:1). If there are multiple, we pick a random external ID for the migration.

Characteristics Data Type

  • APM supports characteristics of datatype: numeric and date.
  • If there are other characteristics with other datatype(s), they are not loaded to APM.

ERP Characteristics Sync

  • The migration tool creates characteristics in the ERP system if there are not present in the ERP system already.
  • When a new characteristic is created in ERP, it syncs with APM only after 120 minutes (or) requires to be manually synced by the user.
  • The sync between ERP & APM has to happen for the migration tool to work as expected.
    • Either we wait manually for the sync to happen before loading the Indicators to APM (or)
    • Perform a manual sync in the APM system

UDR Input Validation

  • During the transform part, a user decision report is generated with a few proposal values.
  • User can override the proposed value with custom input
  • Data validation is NOT performed on the values that are input by the user and these values will be considered as final while loading into the APM system.
  • If there are any issues in the user input, the tool will still try to load the data into APM.

Indicator Positions

  • Indicator Groups (from source) are proposed as Indicator Positions in APM.
  • Since special characters are not supported for Indicator Positions, they are stripped out if present in the Indicator Group from the source
  • There is a limitation of 20 characters for indicator positions in APM, hence if there are any more characters in Indicator Group, they are truncated.

3. Pre-requisites

The following pre-requisites are necessary to be performed before migrating the indicators.

Configuration

  • All necessary configurations required for the tool are maintained as yaml files based on a schema.
  • These files are stored in the config directory.
  • Each yaml file contains a unique config-id parameter.
  • A sample-config.yaml is provided in the same directory for creation of new yaml configuration files.
  • First cell of the Jupyter Notebook defines the CONFIG_ID which needs to be provided by the user for execution.
flowchart LR
    classDef element fill:#fff,color:#000,stroke:none,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;
    classDef teal fill:#2CE0BF, color:#012931, stroke:#012931;
    classDef error fill:#D20A0A, color:#fff, stroke:#5A0404;
    classDef border stroke:#D20A0A,stroke-width:5px;

    a1("Configuration Schema")
    a2("Configuration File 1 <br><pre>yaml</pre>")
    a3("Configuration File 1 <br><pre>yaml</pre>")
    a4{"<pre>configuration id</pre>"}
    a5(("Error"))
    a6("Execution is stopped")
    a7(("Continue"))

    a1 ==> a4
    
    subgraph yaml[" "]
      a2
      a3
    end
    a4 -.->yaml
    yaml -.->|"configuration validation error"|a5-.->a6
    yaml -.->|"validated successfully"|a7
    

    class a1,a2,a3,a4,a5,a6,a7,yaml element;
    class a1,yaml mango;
    class a2,a3 teal;
    class a4 blue;
    class a5,a6 error;
    class yaml border;
    class a7 green; 
Loading

Database

  • Based on the connection string maintained in the yaml configuration file, the database needs to be created/accessible by the Jupyter notebooks.
  • If there are any credentials required to access the database, the corresponding user needs to have access to DDL (CREATE, DROP) and DML (INSERT, SELECT, TRUNCATE, MODIFY) statements with all read/write authorizations.

4. Data Extraction

flowchart LR
    classDef element fill:#fff,color:#000,stroke:none,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;

    a1("<b>Technical Objects</b><br>(EQU/FLOC)")
    a2("<b>External Data</b>")
    a3("<b>Models</b>")
    a4("<b>Templates</b>")
    a5("<b>Indicator Groups</b>")
    a6(("<b>Indicators</b>"))

    subgraph src[" "]
    a1
    a2
    end

    src =="Pick Relevant Data"==> a3 ==> a4 ==> a5 ==> a6


  class src,to,a1,a2,a3,a4,a5,a6 element;
  class src,to mango;
  class a1,a2,a3,a4,a5 blue;
  class a6 green

  linkStyle default font-family:sans-serif, font-size:14px, font-weight:bold;

Loading
  • Extraction data is staged in the directory maintained in the configuration file.
  • A subfolder REPORTS is created within the directory which stores error reports if generated during the migration.

Technical Objects

This section involves extracting technical objects, specifically Equipments and Functional Locations, from the source system. The extraction process applies the following filters:

  • templateId is not blank.
  • status is not 1 (ignores records with unpublished status) - this means that the TOs with statuses, published and in revision are considered for migration

The extracted data is saved as parquet files and staged in the corresponding tables in the database:

Table Name Description
T_PAI_EQU_HEADER Equipment Header
T_PAI_FLOC_HEADER Functional Location Header
API Reference Parameters
Equipment https://api.sap.com/api/EquipmentAPI/path/get_equipment filter
Functional Location https://api.sap.com/api/FunctionalLocationAPI/path/get_floc filter

External Data

This section involves extracting external IDs for Equipments and Functional Locations from the source system. The extraction process applies the following filters:

  • systemType is 'ERP'.
  • systemName is <sap-system-id>_<sap-client-number>.
  • externalId does not contain 'LOCAL_'.
  • objectType is 'EQU' or 'FLOC'.

The extracted data is saved as parquet files and staged in the corresponding tables in the database:

Table Name Description
T_PAI_EXTERNALDATA External Data (Equipments)
T_PAI_EXTERNALDATA_FLOC External Data (Functional Locations)
API Reference Parameters
External Data https://api.sap.com/api/ExternalIDsAPI/path/get_externaldata filter

Models

This section involves extracting the model related information linked to the technical object. The process uses the ApiModel to fetch detailed data for unique models assigned to the technical objects (equipments or functional locations).

flowchart LR
    classDef element fill:#fff,color:#000,stroke:none,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;
    classDef grey fill:#A9B4BE, color:#12171C, stroke:#12171C;
    classDef border stroke:#D20A0A,stroke-width:5px;

    a1("<b>Technical Object</b>")
    a2("<b>Model</b>")
    a3("<pre>template 1</pre>")
    a4("<pre>template 2</pre>")
    a5("<pre>template 3</pre>")
    a6("<pre>template 4<br>...<br>template n</pre>")

   
    a1 ==1:1==> a2
    a2 -.-> |"primary"| a3
    a2 -.-> |"secondary"| a4
    a2 -.-> |"secondary"| a5
    a2 -.-> |"secondary"| a6

    class a1,a2,a3,a4,a5,a6 element;
    class a1 mango;
    class a2 blue;
    class a2 border;
    class a3,a4,a5,a6 grey;
Loading

Templates

This section involves extracting templates related to the technical objects. The extraction process uses the ApiTemplate to fetch detailed data for each template based on the templateId extracted for the Technical Objects (Equipments or Functional Locations) from above.

flowchart LR
    classDef element fill:#fff,color:#000,stroke:none,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;
    classDef grey fill:#A9B4BE, color:#12171C, stroke:#12171C;
    classDef teal fill:#2CE0BF, color:#012931, stroke:#012931;
    classDef border stroke:#D20A0A,stroke-width:5px;
    
    a1("<b>Technical Objects</b><br>(EQU/FLOC)")
    a2("<b>Model</b>")
    a3("<b>Template</b>")
    a4("<b>Indicator Group</b>")
    a5(("<b>Indicator</b>"))

    a1==1:1==>a2==1:n==>a3==1:n==>a4==1:n==>a5

  class a1,a2,a3,a4,a5,a6 element;
  class a1 mango;
  class a2 blue;
  class a3 grey;
  class a3 border;
  class a4 teal;
  class a5 green
Loading
  • When template information is extracted using the templateId, relevant indicator groups and indicators assigned to the templates are also extracted.

The templates from the relevant technical objects are extracted and passed to the APIs. Following are the tables/views used for the same.

Table Name Description
V_PAI_EQU_EXTERNAL_DATA [VIEW] Relevant Equipments with External Data
T_PAI_EQU_TEMPLATE_HEADER Template Header (Equipments)
T_PAI_EQU_INDICATOR_GROUPS Indicator Groups extracted from templates (Equipments)
T_PAI_EQU_INDICATORS Indicators extracted from Indicator Groups (Equipments)
V_PAI_FLOC_EXTERNAL_DATA [VIEW] Relevant Functional Locations with External Data
T_PAI_FLOC_TEMPLATE_HEADER Template Header (Functional Locations)
T_PAI_FLOC_INDICATOR_GROUPS Indicator Groups extracted from templates (Functional Locations)
T_PAI_FLOC_INDICATORS Indicators extracted from Indicator Groups (Functional Locations)
API Reference Parameters
External Data https://api.sap.com/api/TemplateAPI/path/get_templates__templateID_ filter

Indicator Groups

The extracted indicator groups are saved as parquet files and staged in the corresponding tables (mentioned above) in the database.

Indicators

The extracted indicators are saved as parquet files and staged in the corresponding tables (mentioned above) in the database.

5. Transformation

This section involves transforming the extracted data to generate a User Decision Report (UDR).

Generation of UDR

The UDR contains necessary fields from the source system and proposes fields that need user confirmation before migrating the data to the target APM system. The proposals in the UDR are as follows.

flowchart TB
    classDef element fill:#fff,color:#000,stroke:#000,font-family:sans-serif,font-size:14px;
    classDef blue  fill:#89D1FF, color:#00144A,stroke:#00144A;
    classDef mango fill:#FFC933,color:#450B00, stroke:#450B00;
    classDef green fill:#97DD40, color:#0E2B16, stroke:#0E2B16;
    subgraph main [" "]
      a1("Indicator Groups")
      a2("Indicators<br/><pre>Datatype</pre>")
      a3("Configuration<br/><pre>yaml</pre>")
      a4("Indicator Positions")
      a5("ERP Characteristics")
      a6("Indicator Category")
      a7(("Indicators"))
    end

    subgraph legend["<b>Legend</b>"]
        l1["Source<br><pre>PDMS/ASPM</pre>"]
        l2["Target<br><pre>APM</pre>"]
        l3["ERP"]
        l4["Configuration"]
    end

    a1==>a4
    a2==>a5
    a3==>a6

    a4==>a7
    a5==>a7
    a6==>a7

    class main,legend,l1,l2,l3,l4,a1,a2,a3,a4,a5,a6,a7 element
    class l1,a1,a2 blue
    class l2,a4,a7 green
    class l3,a5 mango
Loading
  • Indicator Groups (from source) mapped to Indicator Positions (in APM).
  • Indicators (datatype, length & precision from source) to Characteristics in ERP.
  • A static value configured in the configuration as Indicator Category for APM.

The UDR is generated based on the following views created in the database.

View Name Description
V_TRANSFORM_EQU_INDICATORS Transforms and consolidates data for EQU technical objects.
V_TRANSFORM_FLOC_INDICATORS Transforms and consolidates data for FLOC technical objects.
V_TRANSFORM_INDICATORS Consolidates (union) of EQU and FLOC indicators.

The UDR is saved as a CSV file and sent to the user for validation and input.

UDR Load

  • The UDR once filled by the user is then imported into the tool.
  • User can provide alternative proposals in the input columns.
  • A user input takes higher precedence - meaning, if there is a input provided by the user, the input will be considered for migration. If there is no input provided, only then the proposal is considered for migration.
  • This data is loaded into a table which will act as a basis for data load.
Table Name Description
T_UDR_APM_INDICATORS Stores the UDR data from user for Indicators

6. Data Load

ERP Characteristics

This section involves loading ERP characteristics into the target system. The process includes:

  • Fetching internal IDs for ERP characteristics from the ERP system using the API.
  • Creating missing characteristics in the ERP system if they do not exist.
API Reference Parameters
Characteristic Data for Classification (S/4HANA Cloud Public Edition) https://api.sap.com/api/API_CLFN_CHARACTERISTIC_SRV/path/post_A_ClfnCharacteristicForKeyDate n/a

POST Body

{
  "Characteristic": <string>,
  "CharcStatus": "1",
  "CharcDataType": <string>,
  "CharcLength": <int>>,
  "CharcDecimals": <int>,
  "NegativeValueIsAllowed": <bool>,
  "to_CharacteristicDesc": {
    "results": [
      {
        "Language": "EN",
        "CharcDescription": <string>
      }
    ]
  }
}

The loaded characteristics are saved as parquet files and staged in the corresponding tables in the database.

APM Indicator Positions

This section involves loading APM indicator positions into the target system. The process includes:

  • Fetching existing indicator positions from the APM system.
  • Creating missing indicator positions in the APM system if they do not exist.
API Reference Parameters
Manage Indicators - SAP APM - Asset Health https://api.sap.com/api/Indicator_Related_APIs/path/post_IndicatorPositions n/a

POST Body

{
  "SSID": <system_id>,
  "name":<string>
}

The loaded indicator positions are saved as parquet files and staged in the corresponding tables in the database.

APM Indicators

This section involves loading APM indicators into the target system. The process includes:

  • Fetching existing indicators from the APM system.
  • Creating missing indicators in the APM system if they do not exist.
API Reference Parameters
Manage Indicators - SAP APM - Asset Health https://api.sap.com/api/Indicator_Related_APIs/path/post_Indicators n/a

POST Body

{
  "technicalObject_number": <external_id>,
  "technicalObject_SSID": <system_id>,
  "technicalObject_type": <"EQUI" (or) "FLOC">,
  "category_SSID": <system_id>,
  "category_name": <indicator_category>,
  "characteristics_SSID": <system_id>,
  "characteristics_characteristicsInternalId": <erp_characteristics_id>,
  "positionDetails_ID": <apm_indicator_position_id>
}

The loaded indicators are saved as parquet files and staged in the corresponding tables in the database.