feat: add destination creation support to pinecone #2222
unit_tests.yml
on: pull_request
Matrix: lint
Matrix: test_ingest_unit
Matrix: test_ingest_unit_unstructured
Matrix: test_ingest_help
Matrix: test_install_cli
Annotations
10 errors
lint (3.11)
Process completed with exit code 2.
|
lint (3.10)
The job was canceled because "_3_11" failed.
|
lint (3.10)
Process completed with exit code 2.
|
lint (3.9)
The job was canceled because "_3_11" failed.
|
lint (3.9)
Process completed with exit code 2.
|
lint (3.12)
The job was canceled because "_3_11" failed.
|
lint (3.12)
The operation was canceled.
|
lint (3.13)
The job was canceled because "_3_11" failed.
|
lint (3.13)
The operation was canceled.
|
shfmt
Canceling since a higher priority waiting request for 'Unit Test-refs/pull/361/merge' exists
|