feat: Jira v1 to v2 migration #2243
e2e.yml
on: pull_request
Matrix: setup
check_untagged_tests
5s
embedders_int_test
3m 12s
Matrix: api_based_int_test
src_api_test
32s
Matrix: src_e2e_test
Matrix: dest_e2e_test
blob_storage_connectors_int_test
2m 23s
sql_connectors_int_test
3m 9s
nosql_connectors_int_test
6m 3s
vector_db_connectors_int_test
4m 52s
uncategorized_connectors_int_test
4m 54s
Annotations
11 errors
src_e2e_test (3.9)
Process completed with exit code 1.
|
src_e2e_test (3.10)
The job was canceled because "_3_9" failed.
|
src_e2e_test (3.10)
The operation was canceled.
|
vector_db_connectors_int_test
Canceling since a higher priority waiting request for 'End-to-End Tests-refs/pull/399/merge' exists
|
vector_db_connectors_int_test
The operation was canceled.
|
api_based_int_test (chunkers)
Canceling since a higher priority waiting request for 'End-to-End Tests-refs/pull/399/merge' exists
|
api_based_int_test (chunkers)
The operation was canceled.
|
nosql_connectors_int_test
Canceling since a higher priority waiting request for 'End-to-End Tests-refs/pull/399/merge' exists
|
nosql_connectors_int_test
The operation was canceled.
|
uncategorized_connectors_int_test
Canceling since a higher priority waiting request for 'End-to-End Tests-refs/pull/399/merge' exists
|
uncategorized_connectors_int_test
The operation was canceled.
|