Skip to content
This repository has been archived by the owner on May 7, 2020. It is now read-only.

Latest commit

 

History

History
65 lines (43 loc) · 1.24 KB

PROJECTS.md

File metadata and controls

65 lines (43 loc) · 1.24 KB

Projects

Anchoring

Lockers(Inside)

  • Install ventillation.

Bathroom

  • Install second drawer for blankets under the new shelf.
  • Build space for trash bag.

Galley

  • Install ventillation from under sink.

Engine

  • Change water pump belt

Sails

  • Install new suncover on Jib.
  • Design and install lazyjacks

Thruhulls

  • Redo kitchen sink thruhull.
    • Buy new thruhull[order]
  • Remove old head toilet intake thruhull.
  • Remove old head toilet outtake thruhull.
  • Remove old head macerator outtake thruhull.
  • Remove old head sink thruhull.
  • Remove old salt water intake thruhull.
  • Remove knotmeter thruhull.

Nav

  • Build new cover for running light case.
  • Install new LED in running light.
  • Install second radar reflector.
  • Buy SAT phone plan
  • Download Navionics maps on all devices

Bilge pump

  • Reconnect pump to switch.
  • Install rocker switch for manual turn on

Standing Rigging

  • Climb mast to check connections

Running Rigging

  • Install furler line
  • Install main halyard