forked from DUNE/cern-prototype-proposal
-
Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathcryo.tex
370 lines (314 loc) · 26 KB
/
cryo.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
\subsection{Cryostat}
The Single Phase TPC test at CERN will use a membrane tank technology to contain 725 tons of LAr, equivalent to about $520 m^3$. The design is based on a scaled up version of the LBNE 35-ton Prototype and the Fermilab Short-Baseline Near Detector.
%We propose that the cryostat be housed in the extension of the EHN1 Bat 887 at CERN, where the cryogenic system components will also be located. (moved to sec 7)
The cryostat will use a steel outer supporting structure with a metal liner inside to isolate the insulation volume, similar to the one of the dual phase detector prototype WA105 $1\times1\times3$ and to the Fermilab Short-Baseline Near Detector. The support structure will rest on I-beams to allow for air circulation underneath in order to maintain the temperature within the allowable limits.
%The scope of the EHN1 cryostat subsystem includes the design, procurement, fabrication, testing, delivery and oversight of a cryostat to contain the liquid argon and the TPC. (moved to sec 8)
This section describes the proposed design, whose scope encompasses the following components:
\begin{itemize}
\item steel outer supporting structure,
\item main body of the membrane cryostat (sides and floor),
\item top cap of the membrane cryostat.
\end{itemize}
A membrane cryostat design commonly used for liquefied natural gas (LNG) storage and transportation will be used. In this vessel a stainless steel membrane contains the liquid cryogen. The pressure loading of the liquid cryogen is transmitted through rigid foam insulation to the surrounding outer support structure, which provides external support. The membrane is corrugated to provide strain relief resulting from temperature related expansion and contraction. The vessel is completed with a top cap that uses the same technology.
Two membrane cryostat vendors are known: GTT (Gaztransport \& Technigaz) from France and IHI (Ishikawajima-Harima Heavy Industries) from Japan. Each one is technically capable of delivering a membrane cryostat that meets the design requirements for this detector. To provide clarity, only one vendor is represented in this document, GTT; this is for informational purposes only. Figure 1 shows a 3D model of the GTT membrane and insulation design.
\begin{figure}
\begin{center}
\includegraphics[width=.9\textwidth]{figures/membrane-exploded-view} % (figure 1)
\caption[Exploded view of the membrane cryostat technology]{\label{fig:lar-org} Exploded view of the membrane cryostat technology}
\end{center}
\end{figure}
The conceptual proposed design for the Single Phase Test at CERN cryostat is a rectangular vessel measuring 9.5 m in length (parallel to the beam direction), 7.3 m in width, and 8.40 m in height; containing a total mass of 725 tons of liquid argon. Figure~\ref{fig:cryostat-views} shows side and end views of the cryostat respectively. Figure 3 shows a 3D view. To minimize the contamination from warm surfaces, during operation the temperature of all surfaces in the ullage shall be lower than 100 K.
The top plate will contain two hatches, one to install the TPCs and the other to access the tank; it will also contain a manhole to enter the tank after closing the hatches, and several penetrations for the cryogenic system and the detector. %The top plate will contain two hatches to install the TPCs and enter the tank, a manhole and several penetrations for the cryogenic system and the detector.
\begin{figure}
\begin{center}
\includegraphics[width=.55\textwidth]{figures/cryostat-side-view} % (figure 2a)
\includegraphics[width=.35\textwidth]{figures/cryostat-end-view} %(figure 2b)
\caption[Views of cryostat]{\label{fig:cryostat-views} Side (left) and end (right) views of cryostat}
\end{center}
\end{figure}
\begin{figure}
\begin{center}
\includegraphics[width=.75\textwidth]{figures/cryostat-isometric-view} % (figure 3)
\caption[Isometric view of cryostat]{\label{fig:cryostat-views} Isometric view of the membrane cryostat}
\end{center}
\end{figure}
\textbf{Design Parameters}
This design includes technical solutions that may be of interested for the future needs of the Long Baseline Neutrino program. For example the use of a cold ullage (\textless 100 K) to lower the impurities in the gas region, and of a LAr pump outside the cryostat to minimize the effect of noise, vibration and microphonics to the TPC inside the liquid argon volume.
The design parameters for the TPC Test at CERN cryostat are listed in Table~\ref{tbl:cryogenics-design-parameters}.
\begin{table}[htpb]
\caption{Design requirements for the membrane cryostat}
\label{tbl:cryogenics-design-parameters}
\centering
\begin{tabular}{|p{.4\textwidth}|p{.5\textwidth}|}
\hline
\textbf{Design Parameter} & \textbf{Value} \\ \hline
Type of structure & Membrane cryostat \\ \hline
Membrane material & SS 304/304L, 316/316L or equivalent. \\ \hline
Fluid & Liquid argon (LAr) \\ \hline
Other materials upon approval.\\ \hline
Outside reinforcement (support structure) & Steel enclosure with metal liner to isolate the outside from the insulation space, standing on legs to allow for air circulation underneath. \\ \hline
Total cryostat volume & 583 m3 \\ \hline
Total LAr volume & 520 m3 \\ \hline
LAr total mass & 725,000 kg \\ \hline
Minimum inner dimensions (flat plate to flat plate). & 7.3 m (W) x 9.5 m (L) x 8.4 m (H) \\ \hline
Depth of LAr & 7.5 m (0.9 m ullage, same as LBNF) \\ \hline
Primary membrane & 1.2 mm thick SS 304L corrugated stainless steel\\ \hline
Secondary barrier system & GTT design; 0.07 mm thick aluminum between fiberglass cloth. Overall thickness 1 mm located between insulation layers. \\ \hline
Insulation & Polyurethane foam (0.8 m thick from preliminary calculations) \\ \hline
Maximum static heat leak & 10 W/m2 \\ \hline
LAr temperature & 88 +/- 1K \\ \hline
Operating gas pressure & Positive pressure. Nominally 70 mbarg ($\sim$1 psig) \\ \hline
Vaccuum & No vacuum \\ \hline
Design pressure & 350 mbarg ($\sim$5 psig) + LAr head (1,025 mbarg) \\ \hline
Design temperature & 77 K (liquid nitrogen temperature for flexibility) \\ \hline
Temperature of all surfaces in the ullage during operation & \textless 100 K \\ \hline
Leak tightness & $1e-6$ mbar*l/sec \\ \hline
Maximum noise/vibration/microphonics inside the cryostat & LAr pump outside the cryostat \\ \hline
Beam window & Precise location TBD. Figure~\ref{fig:cryostat-views} shows the location where the beam enters the cryostat. \\ \hline
Accessibility after operations & Capability to empty the cryostat in 30 days and access it in 60 days after the end of operations. \\ \hline
Lifetime / Thermal cycles & Consistent with liquid argon program. TBD. \\ \hline
\end{tabular}
\end{table}
\textbf{Insulation system and secondary membrane}
The membrane cryostat requires insulation applied to all internal surfaces of the outer support structure
and roof in order to control the heat ingress and hence required refrigeration heat load.
To avoid bubbling of the liquid Argon inside the tank, the maximum required static heat leak is $10 W/m^2$ for the floor and the sides and $15 W/m^2$ for the roof, higher to account for the penetrations that increase the heat budget. Preliminary calculations show that these values it can be obtained using 0.8 m thick insulation panels of polyurethane foam.
Preliminary calculations show that it can be obtained using 0.8 m thick insulation panels.
Given an
average thermal conductivity coefficient for the insulation material of 0.0283 W/(m·K), the heat input
from the surrounding steel is expected to be about 3.7 kW total. It assumes that the hatches are foam
insulated as well. This is shown in Table~\ref{tbl:heat-load-calc}.
The insulation material is a solid reinforced polyurethane foam manufactured as composite panels. The
panels get laid out in a grid with 3 cm gaps between them (that will be filled with fiberglass) and fixed
onto anchor bolts anchored to the support structure. The composite panels contain the two layers of
insulation with the secondary barrier in between. After positioning adjacent composite panels and filling
the 3 cm gap, the secondary membrane is spliced together by epoxying an additional overlapping layer
of secondary membrane over the joint. All seams are covered so that the secondary membrane is a
continuous liner.
In the current GTT design, the secondary membrane is comprised of a thin aluminum sheet and
fiberglass cloth. The fiberglass-aluminum-fiberglass composite is very durable and flexible with an
overall thickness of about 1 mm. The secondary membrane is placed within the insulation space. It
surrounds the bottom and sides. In the unlikely event of an internal leak from the primary membrane of
the cryostat into the insulation space, it will prevent the liquid cryogen from migrating all the way
through to the steel support structure where it would degrade the insulation thermal performance and
could possibly cause excessive thermal stress in the support structure. The liquid cryogen, in case of
leakage through the inner (primary) membrane will escape to the insulation volume, which is purged with
GAr at the rate of one volume exchange per day.
\begin{table}[htpb]
\caption{Heat load calculation for the membrane cryostat (insulation thickness = 0.8 m). (note to self: has right values)}
\label{tbl:heat-load-calc}
\centering
\begin{tabular}{|p{.15\textwidth}|p{.15\textwidth}|p{.15\textwidth}|p{.15\textwidth}|p{.15\textwidth}|}
\hline
\textbf{Element} & \textbf{Area ($m^2$)} & \textbf{K ($W/mK$)} & \textbf{$\Delta$ T ($K$)}
& \textbf{Heat Input ($W$)}\\ \hline
Base & 83 & 0.0283 &205 & 605 \\ \hline
End walls & 190 & 0.0283 & 205 & 1,374\\ \hline
Side walls & 149 & 0.0283 & 205 & 1,081 \\ \hline
Roof & 83 & 0.0283 & 205 & 605\\ \hline
& & & & \\ \hline
Total & & & & 3,665 \\ \hline
\end{tabular}
\end{table}
\textbf{Cryostat Configuration}
With the intent to minimize the contamination in the gas region, the ullage will be kept cold (\textless 100 K). It has been observed in the Materials Test Stand (MTS) and the Liquid Argon Purity Demonstrator (LAPD) at Fermilab that the outgassing is significantly reduced below 100 K [add reference]. A possible way to achieve this requirement is to spray a mist of clean liquid and gaseous argon to the metal surfaces in the ullage and keep them cold, similar to the strategy that was developed for the cool down of the LBNE 35 Ton prototype.
\textbf{Outer Support Structure}
The reference design is a steel support structure with a metal liner on the inside to isolate the insulation region and keep the moisture out. This choice allows natural and forced ventilation to maintain the temperature of the steel within its limit, without the need of heating elements and temperature sensors. It reduces the time needed for the construction: the structure will be prefabricated in pieces of dimensions appropriate for transportation, shipped to the destination and only assembled in place. Fabrication will take place at the vendor’s facility for the most part. This shortens the construction of the outer structure on the detector site, leaving more time for completion of the building infrastructure. If properly designed, a steel structure may allow the cryostat to be moved, should that be desired in the future.
\textbf{Main body of the membrane cryostat}
The sides and bottom of the vessel constitute the main body of the membrane cryostat. They consist of several layers. From the inside to the outside the layers are stainless steel primary membrane, insulation, thin aluminum secondary membrane, more insulation, and steel outer support structure with meal panels acting as vapor barier. The secondary membrane contains the LAr in case of any primary membrane leaks and the vapor barrier prevents water ingress into the insulation. The main body does not have side openings for construction. The access is only from the top. There is a side penetration for the liquid argon pump for the purification of the cryogen.
\textbf{Top cap}
Several steel reinforced plates welded together constitute the top cap. The stainless steel primary
membrane, intermediate insulation layers and vapor barrier continue across the top of the detector,
providing a leak tight seal. The secondary barrier is not used nor required at the top. The cryostat roof is
a removable steel truss structure that also supports the detector. Stiffened steel plates are welded to the
underside of the truss to form a flat vapor barrier surface onto which the roof insulation attaches directly.
The penetrations will be clustered in the back region. The top cap will have a large opening for TPC
installation, a secondary smaller opening for personnel access and a manhole to enter the tank after the
hatches have been closed.
The truss structure rests on the top of the supporting structure where a positive structural connection
between the two is made to resist the upward force caused by the slightly pressurized argon in the ullage
else within the cryostat (TPC planes, electronics, sensors, cryogenic and gas plumbing connections) is
supported by the steel plates under the truss structure. All piping and electrical penetration into the
interior of the cryostat are made through this top plate, primarily in the region of the penetrations to
minimize the potential for leaks. Studs are welded to the underside of the top plate to bolt the insulation
panels. Insulation plugs are inserted into the bolt-access holes after panels are mounted. The primary
membrane panels are first tack-welded then fully welded to complete the inner cryostat volume.
Table~\ref{tbl:cryostat-top-parameters} presents the list of the design parameters for the top of the cryostat.
\begin{table}[htpb]
\caption{Design parameters for the top of the cryostat}
\label{tbl:cryostat-top-parameters}
\centering
\begin{tabular}{|p{.4\textwidth}|p{.5\textwidth}|}
\hline
\textbf{Design Parameter} & \textbf{Value} \\ \hline
Configuration & Removable metal plate reinforced with trusses anchored to the membrane cryostat support structure. Contains multiple penetrations of various sizes and a manhole. Number, location and size of the penetrations TBD. Provisions shall be made to allow for removal and re-welding six (6) times.\\ \hline
Plate/Trusses non-wet material & Steel if room temperature.
SS 304/304 or equivalent if at cryogenic temperature
\\ \hline
Wet material & SS 304/304L, 316/316L or equivalent.
Other materials upon approval.
\\ \hline
Fluid & Liquid argon (LAr) \\ \hline
Design pressure & 350 mbarg (~5 psig) \\ \hline
Design temperature & 77 K (liquid nitrogen temperature for flexibility) \\ \hline
Inner dimensions & To match the cryostat \\ \hline
Maximum allowable roof deflection & 0.028 m (span/360 from LBNF) \\ \hline
Maximum static heat leak & \textless 20 W/m2 \\ \hline
Temperatures of all surfaces in the ullage during operation & \textless 100 K \\ \hline
Additional design loads & - Top self-weight \\
& - TPC (~3,000 kg on each anchor)\\
& - TPC anchors (TBD)\\
& - Live load (488 kg/m2)\\
& - Electronics racks (400 kg in the vicinity of the feed through)\\
& - Services (150 kg on every feed through)\\
\\ \hline
TPC anchors & Capacity: 3,000 kg each anchor.
Number and location TBD. Minimum 6.
\\ \hline
Hatch opening for TPC installation & 3,550 m x 2,000 m (location TBD)\\ \hline
Grounding plate & 1.6 mm thick copper sheet brazed to the bottom of the top plate\\ \hline
Lifting fixtures & Appropriate for positioning the top at the different parts that constitute it. \\ \hline
Cold penetrations & Location and design TBD. \\ \hline
Lifetime / Thermal cycles & Consistent with the liquid argon program TBD. \\ \hline
\end{tabular}
\end{table}
%\floatbarrier<--------- requires a package that's not set: \usepackage{placeins}
\textbf{Cryostat grounding and isolation requirements}
The cryostat has to be grounded and electrically isolated from the building. %Table IV
This section presents the list of the current grounding and isolation requirements for the cryostat.
Figure~\ref{fig:top-plate-gnd} shows the layout of the top plate grounding.
\textbf{Isolation}
\begin{enumerate}
\item The cryostat membrane and any supporting structure, whether it is a steel structure or a concrete and rebar pour, shall be isolated from any building metal or building rebar with a DC impedance greater than 300 k$\Omega$.
\item All conductive piping penetrations through the cryostat shall have dielectric breaks prior to entering the cryostat and the top plate.
\end{enumerate}
\textbf{Grounding}
\begin{enumerate}
\item The cryostat, or ``detector'' ground, shall be separated from the ``building'' ground.
\item A safety ground network consisting of saturated inductors shall be used between detector ground and building ground.
\item Parameters TBD.
\end{enumerate}
\textbf{Top plate grounding}
\begin{enumerate}
\item If the cryostat is contained within a concrete pour, the top plate shall be electrically connected to any rebar used in that pour, and the rebar shall be conductively tied at regular intervals. Parameters TBD.
\item The top grounding plate shall be electrically connected to the cryostat membrane by means of copper braid connections.
\begin{enumerate}
\item Each connection shall be at least 1.6 mm thick and 63.5 mm wide.
\item The length of each connection is required to be as short as possible.
\item The distance between one connection and the next one shall be no more than 1.25 m.
\item The layout can follow the profile of several pieces of insulation, but it shall be continuous.
\item The DC impedance of the membrane to the top plate shall be less than 1 ohm.
\end{enumerate}
\end{enumerate}
\begin{figure}
\begin{center}
\includegraphics[width=.95\textwidth]{figures/cryostat-top-plate-gnd} % (figure 4)
\caption[Top plate grounding layout]{\label{fig:top-plate-gnd}Top plate grounding layout}
\end{center}
\end{figure}
\textbf{Leak prevention}
The primary membrane will be subjected to several leak tests and weld remediation, as necessary. All
(100\%) of the welds will be tested by an Ammonia colorimetric leak test (ASTM E1066-95) in which
welds are painted with a reactive yellow paint before injecting a Nitrogen-Ammonia mixture into the
insulation space of the tank. Wherever the paint turns purple or blue, a leak is present. The developer is
removed, the weld fixed and the test is performed another time. Any and all leaks will be repaired. The
test lasts a minimum of 20 hours and is sensitive enough to detect defects down to 0.003 mm in size
and to a $10^{-7} std-cm^3/s$ leak rate (equivalent leak rate at standard pressure and temperature, 1 bar and
273 K). To prevent infiltration of water vapor or oxygen through microscopic membrane leaks (below
detection level) the insulation spaces will be continuously purged with gaseous argon to provide one
volume exchange per day. The insulation space will be maintained at 70 mbar, slightly above
atmospheric pressure. This space will be monitored for changes that might indicate a leak from the
primary membrane. Pressure control devices and safety relief valves will be installed on the insulation
space to ensure that the pressure does not exceed the operating pressure inside the tank. The purge gas
will be recirculated by a blower, purified, and reused as purge gas. The purge system is not safety-
critical; an outage of the purge blower would have negligible impact on LAr purity.
%%%%%%%%%%%%%%%%%
\subsection{Cryostat size from TPC dimensions (Move to begining of sec 4 per DM) }
The minimum internal size of the cryostat is determined from size of the TPC. At the bottom of the
cryostat there needs to be a minimum of 0.3 m between the frame of the CPA and closest point on the SS
membrane. This is to prevent high voltage discharge between the CPA and the electrically grounded
membrane. It is foreseen that there would be some cryogenic piping and instrumentation under the TPC.
There is a height allowance of 0.1 m for this. There will be access and egress space around the outside
of the TPC and the membrane walls. On three sides, 1.0 m of space is reserved for this. The final side of
the TPC will have piping and instrumentation for the cryogenic system. There will be 1.3 m of space
reserved for this.
The support system for the TPC will be located at the top between the underside of the cryostat roof and
the top of the TPC. The plan is to model this space similar to what is planned for the far site TPC. There
will be 0.9 m of ullage space. In order to prevent high voltage discharge, the upper most part of the CPA
needs to be submerged a minimum of 0.3 m below the liquid Argon surface. The top of the TPC will be
separated from the membrane by a minimum of 1.2 m.
Adding all of these to the size of the TPC yields the minimum inner dimensions of the cryostat. A
minimally sized cryostat would be 9.5 m long, 7.3 m wide and 8.4 m high. This assumes the TPC will be
positioned inside the cryostat with the CPAs and end field cages parallel to the walls of the cryostat. Also
there is no space allotted for a beam window to enter the cryostat. Clearance would need to be added if
it violates any of the current boundaries listed above.
These dimensions also preserve the ability to reverse the order of the APAs and CPAs inside the TPC. The
current plan is to have the APAs located in the center of the cryostat with a CPA on each side. Reversing
this to have the CPA in the center and APAs on each side may be required to achieve some of the
proposed physics. The orientation of the TPC components will be finalized after various scenarios have
been sufficiently simulated.
%%%%%%%%%%%%%%%%%
\subsection{Cryogenic System}
Figure~\ref{fig:proposed-LN2-system} outlines the basic scheme of the LN2 supply system, which was
proposed by CERN for the Short Baseline Program and found to be an appropriate solution for this
detector as well. The experiment will rely on LN2 tankers for regular deliveries to a local dewar storage,
which will be sized to provide several days of cooling capacity in the event of a delivery interruption.
From the dewar storage the LN2 is then transferred to a distribution facility located in the experimental
hall. It includes a small buffer volume and an LN2 pumping station that transfers the LN2 to the argon
condenser and other services as needed. The low estimated heat leak of the vessel ($\sim$3.7 kW) and the
location inside an above ground building allow for use of an open loop system typical of other
installations operated at Fermilab (LAPD, LBNE 35 ton prototype, MicroBooNE) and at CERN (???).
Main goal of the LN2 system is to provide cooling power for the argon condenser, the initial cool down of
the vessel and the detector, and all other services as needed.
Table~\ref{tbl:cryo-design-parameters} presents the list of
requirements for the cryogenic system for the Single Phase TPC test at CERN detector.
Figure~\ref{fig:proposed-LAr-system} shows a schematic diagram of the proposed liquid argon system. It is based on the design of the
LBNE 35 ton prototype, the MicroBooNE detector systems and the current plans for the Long Baseline Far
Detector.
Main goal of the LAr system is to purge the cryostat prior to the start of the operations (with GAr in open
and closed loop), cool down the cryostat and fill it with LAr. Then continuously purify the LAr and the boil
off GAr to maintain the required purity (electron lifetime measured by the detector).
The LAr receiving facility includes a storage dewar and an ambient vaporizer to deliver LAr and GAr to the
cryostat. The LAr goes through the liquid argon handling and purification system, whereas the Gar
through the gaseous argon purification before entering the vessel.
The LAr purification system is currently equipped with a filter containing mol sieve and copper beds, and
a regeneration loop to regenerate the filter itself. Filters containing Oxysorb and Hydrosorb rather than
mol sieve and copper beds, were also successfully employed. Same concept, but different medium.
Studies are ongoing to standardize the filtration scheme and select the optimal filter medium for all
future generation detectors, including this test prototype.
During operation, an external LAr pump circulates the bulk of the cryogen through the LAr purification
system. The boil off gas is first recondensed and then is sent to the LAr purification system before re-
entering the vessel.
\begin{table}[htpb]
\caption{Design requirements for the cryogenic system}
\label{tbl:cryo-design-parameters}
\centering
\begin{tabular}{|p{.45\textwidth}|p{.45\textwidth}|}
\hline
\textbf{ Parameter} & \textbf{Value} \\ \hline
Location & Preferably not in front of the cryostat (on the beam) \\ \hline
Cooling Power & TBD based on the heat leak of the cryostat (estimated 3.7 kW), the cryo-piping and all other contributions (cryogenic pumps, etc.) \\ \hline
Liquid argon purity in cryostat & 10 ms electron lifetime (30 ppt O2 equivalent) \\ \hline
Gaseous argon piston purge rate of rise & 1.2 m/hr \\ \hline
Membrane cool-down rate & From manufacturer \\ \hline
TPCs cool-down rate & \textless40 K/hr,\textless10 K/m (vertically)
\\ \hline
Mechanical load on TPC & The LAr or the gas pressure shall not apply a mechanical load to the TPC greater than 200 Pascal. \\ \hline
Nominal LAr purification flow rate (filling/ops) & 5.5 day/volume exchange \\ \hline
Temperature of all surfaces in the ullage during operations & \textless100 K \\ \hline
Gaseous argon purge within insulation & 1 volume change /day of the open space between insulation panels. \\ \hline
Lifetime of the cryogenic system & Consistent with the LAr program. TBD. \\ \hline
\end{tabular}
\end{table}
\begin{figure}
\begin{center}
\includegraphics[width=.75\textwidth]{figures/proposed-LN2-system} % (figure 3)
\caption[Schematic diagram for the proposed LN2 system]{\label{fig:proposed-LN2-system}Schematic diagram for the proposed LN2 system}
\end{center}
\end{figure}
\begin{figure}
\begin{center}
\includegraphics[width=.75\textwidth]{figures/proposed-LAr-system} % (figure 3)
\caption[Schematic diagram for the proposed LAr system]{\label{fig:proposed-LAr-system} Schematic diagram for the proposed LAr system}
\end{center}
\end{figure}