Non-essential will be loads connected between the grid CT clamp and the inverter. So this is loads connected to the grid and won't be backed up by solar/battery/gen, but can still get power from the inverter if the grid is stable and you configured the inverter to feed back into the grid/zero export. The direction of the balls moving might need a template sensor to invert the direction, or maybe @slipx06 has another way to do this, you could ask here: https://github.com/slipx06/sunsynk-power-flow-card |
Beta Was this translation helpful? Give feedback.
-
@concierge-at you can set |
Beta Was this translation helpful? Give feedback.
@concierge-at you can set
invert_aux: true
under the load section. You can also hide non_essential if you have everything connected to the inverter output. There is an option under the grid section,show_nonessential: false