SHIP-0039: Hardening guideline for build scheduler options feature #120
Labels
help wanted
Denotes an issue that needs help from a contributor. Must meet "help wanted" guidelines.
Milestone
Feature
Provide a hardening guide for Shipwright, with an emphasis on best practices when the "SHIP-0039: Build Scheduler Options" feature is enabled. Allowing builds to be scheduled on control plane (or other system/specialized) nodes could risk availability of co-located workloads.
Refer to the enahancement proposal for the particular details.
The text was updated successfully, but these errors were encountered: