This issue is to document the modifications in the REFLOSystem Costing package to be consistent with the WaterTAP Costing:
Aggregate flow costs from the Treatment Costing Block: Currently the aggregate_flow_costs for chemicals is not included in the REFLOSystem costing. And the aggregated heat and electricity costs are named total_heat_operating_cost and total_electric_operating_cost
REFLOSystemCosting does not have a maintenance_labor_chemical_factor
LCOH calculation needs to be verified
REFLOSystem costing to allow for scenario where grid_frac = 1
Need to check yearly_heat_production.
The text was updated successfully, but these errors were encountered:
This issue is to document the modifications in the REFLOSystem Costing package to be consistent with the WaterTAP Costing:
aggregate_flow_costs
for chemicals is not included in the REFLOSystem costing. And the aggregated heat and electricity costs are namedtotal_heat_operating_cost
andtotal_electric_operating_cost
maintenance_labor_chemical_factor
yearly_heat_production