You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The test workflow requires modifications to adapt to the new image build processes, so the steps must be adapted to these new builds and the stack deployment must also be modified to use a private repository, which will contain the non-productive images.
The current test workflow builds images from the script that the repository contains, so it is necessary to verify whether we will be able to use the workflows of each of the components for building images or if we will use images that will be hosted in the ECR repositories, so as not to depend on the previous execution of the build.
Tasks
Analyze the feasibility of building images.
Modify Wazuh Docker deployment to use images from private repositories.
Post-deployment test review.
DRI
Gonzalo Acuña
The text was updated successfully, but these errors were encountered:
vcerenu
changed the title
Changes in test workflow
MVP - Changes in test workflow
Jan 15, 2025
Description
The test workflow requires modifications to adapt to the new image build processes, so the steps must be adapted to these new builds and the stack deployment must also be modified to use a private repository, which will contain the non-productive images.
The current test workflow builds images from the script that the repository contains, so it is necessary to verify whether we will be able to use the workflows of each of the components for building images or if we will use images that will be hosted in the ECR repositories, so as not to depend on the previous execution of the build.
Tasks
DRI
Gonzalo Acuña
The text was updated successfully, but these errors were encountered: