-
Notifications
You must be signed in to change notification settings - Fork 0
Ranmanuyan/7_Flow_shop_Gurobi_deter
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
Codes wrote by Lei Liu POLIMI, ITALY ----------------------------------------------------------------------- DeterFlowShopTar.py 12, Jun, 2020 This is a flow shop scheduling with total tardiness minimization. Deterministic Version The classical tardiness calculation model for flow shop scheduling The Processing time is given and deterministic. Use python and Gurobi to solve it. The model is in the Research Notes Book for reference - DAILYIMPORTANTACCUMULATION - 1.3.5 Calculation of total tardiness in flow shop scheduling ----------------------------------------------------------------------- FS_tar_ reentrance.py 3 July 2020 deterministic This is a flow shop scheduling with total tardiness minimization with two machines(deterministic) need to be re-entered. modify the classical tardiness model: 1, transform it as a flow shop with bypass 2, add the disjunctive constraints 3, add starttime and Y_ij binary variables ----------------------------------------------------------------------- 15 Sep 2020 getObjfromShedule have a known schedule, calculate its obj, such as total completion time. with disjunctive constraints/ or half disjunctive constraints . ----------------------------------------------------------------------- 15 Sep 2020 location_Schedule.py Flow shop folder transform from a location list to schedule list ----------------------------------------------------------------------- optimal_for_scenario.py given a new scenario, calculate the optimal schedule and total completion time pay attention to the disjunctive constraints,
About
No description, website, or topics provided.
Resources
Stars
Watchers
Forks
Releases
No releases published
Packages 0
No packages published