Skip to content

Fix protoc version #519

Fix protoc version

Fix protoc version #519

Triggered via push February 25, 2024 09:34
Status Failure
Total duration 25s
Artifacts

cmake.yml

on: push
Matrix: build

Annotations

11 errors
build (ubuntu-latest, clang, latest)
Error: unable to get latest version
build (ubuntu-latest, clang, 12)
The job was canceled because "ubuntu-latest_clang_lates" failed.
build (ubuntu-latest, clang, 12)
Error: unable to get latest version
build (ubuntu-latest, gcc, 11)
The job was canceled because "ubuntu-latest_clang_lates" failed.
build (ubuntu-latest, gcc, 11)
Error: unable to get latest version
build (ubuntu-latest, gcc, latest)
The job was canceled because "ubuntu-latest_clang_lates" failed.
build (ubuntu-latest, gcc, latest)
Error: unable to get latest version
build (macos-latest)
The job was canceled because "ubuntu-latest_clang_lates" failed.
build (macos-latest)
The operation was canceled.
build (windows-latest)
The job was canceled because "ubuntu-latest_clang_lates" failed.
build (windows-latest)
The operation was canceled.