chore(deps): bump docker/build-push-action from 6.11.0 to 6.12.0 #1777
compatibility-e2e-v2.yml
on: pull_request
Matrix: compatibility_e2e_tests
Annotations
7 errors and 2 warnings
compatibility_e2e_tests (scheduler)
Process completed with exit code 1.
|
compatibility_e2e_tests (manager)
The job was canceled because "scheduler" failed.
|
compatibility_e2e_tests (manager)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
The job was canceled because "scheduler" failed.
|
compatibility_e2e_tests (seed-client)
The operation was canceled.
|
compatibility_e2e_tests (client)
The job was canceled because "scheduler" failed.
|
compatibility_e2e_tests (client)
The operation was canceled.
|
compatibility_e2e_tests (scheduler)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
compatibility_e2e_tests (seed-client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
client-e2e-tests-logs
|
1 GB |
|
dragonflyoss~dragonfly~5LTGK5.dockerbuild
|
43.3 KB |
|
dragonflyoss~dragonfly~7Y6VEC.dockerbuild
|
50.8 KB |
|
dragonflyoss~dragonfly~I794U3.dockerbuild
|
43.5 KB |
|
dragonflyoss~dragonfly~KOEU2X.dockerbuild
|
43.3 KB |
|
dragonflyoss~dragonfly~MJ2749.dockerbuild
|
50.5 KB |
|
dragonflyoss~dragonfly~N0HR0V.dockerbuild
|
51.4 KB |
|
dragonflyoss~dragonfly~OPWN95.dockerbuild
|
44.3 KB |
|
dragonflyoss~dragonfly~UOY6TM.dockerbuild
|
50.7 KB |
|
manager-e2e-tests-logs
|
1 MB |
|
scheduler-e2e-tests-logs
|
6.59 MB |
|