Skip to content

chore: lock file maintenance #282

chore: lock file maintenance

chore: lock file maintenance #282

Triggered via pull request January 7, 2025 06:04
Status Failure
Total duration 45s
Artifacts

build.yml

on: pull_request
cancel-existing
5s
cancel-existing
Matrix: test
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 3 warnings
test (18, ubuntu-latest)
Process completed with exit code 1.
test (16, windows-latest)
The job was canceled because "_18_ubuntu-latest" failed.
test (16, windows-latest)
The operation was canceled.
test (16, ubuntu-latest)
The job was canceled because "_18_ubuntu-latest" failed.
test (16, ubuntu-latest)
The operation was canceled.
test (14, ubuntu-latest)
The job was canceled because "_18_ubuntu-latest" failed.
test (14, ubuntu-latest)
The operation was canceled.
test (16, macos-latest)
The job was canceled because "_18_ubuntu-latest" failed.
test (16, macos-latest)
The operation was canceled.
cancel-existing
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test (18, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test (18, ubuntu-latest)
No files were found with the provided path: **/__image_snapshots__/__diff_output__. No artifacts will be uploaded.