Chore(deps): bump the crates-io group with 3 updates #91
build.yml
on: pull_request
Features
1m 27s
Run benchmarks
5m 26s
Check for documentation errors
37s
Measure coverage
1m 29s
Format
12s
Clippy
1m 0s
Clippy (Nightly)
57s
Matrix: Build+test
Annotations
10 errors
Build+test (beta, ubuntu-20.04)
Process completed with exit code 101.
|
Build+test (windows-latest, stable)
The job was canceled because "beta_ubuntu-20_04" failed.
|
Build+test (windows-latest, stable)
The operation was canceled.
|
Build+test (nightly, ubuntu-20.04)
The job was canceled because "beta_ubuntu-20_04" failed.
|
Build+test (nightly, ubuntu-20.04)
The operation was canceled.
|
Build+test (stable, ubuntu-20.04)
The job was canceled because "beta_ubuntu-20_04" failed.
|
Build+test (stable, ubuntu-20.04)
The operation was canceled.
|
Build+test (macos-latest, stable)
The job was canceled because "beta_ubuntu-20_04" failed.
|
Build+test (macos-latest, stable)
The operation was canceled.
|
Features
Process completed with exit code 101.
|