Skip to content

Automated test plan #2072

Automated test plan

Automated test plan #2072

Re-run triggered January 31, 2025 19:35
Status Failure
Total duration 57m 0s
Billable time 15m
Artifacts 8

ci.yaml

on: pull_request
Matrix: build
Matrix: hlab
Matrix: vlab-upgrade
Matrix: vlab
publish-release
0s
publish-release
publish-master
0s
publish-master
Fit to window
Zoom out
Zoom in

Annotations

4 errors
vlab-upgrade (spine-leaf, beta-1, --usb)
The self-hosted runner: vlab-7tn87-runner-q7htz lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
vlab-upgrade (spine-leaf, 24.09, -m=iso)
The self-hosted runner: vlab-7tn87-runner-xqms7 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
hlab (spine-leaf, true, iso)
Process completed with exit code 2.
hlabs
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
show-tech-hlab-spine-leaf-true-iso
244 KB