Skip to content

update fluentd-elasticsearch & Bump github/super-linter from 5 to 6 #346

update fluentd-elasticsearch & Bump github/super-linter from 5 to 6

update fluentd-elasticsearch & Bump github/super-linter from 5 to 6 #346

Triggered via pull request April 29, 2024 09:02
Status Failure
Total duration 12m 20s
Artifacts

ci.yaml

on: pull_request
Matrix: kubeconform-chart
Matrix: install-chart
Fit to window
Zoom out
Zoom in

Annotations

5 errors
install-chart (v1.28.6)
Process completed with exit code 1.
install-chart (v1.29.1)
The job was canceled because "v1_28_6" failed.
install-chart (v1.29.1)
Process completed with exit code 1.
install-chart (v1.27.10)
The job was canceled because "v1_28_6" failed.
install-chart (v1.27.10)
The operation was canceled.