Skip to content

Initial commit.

Initial commit. #1

Re-run triggered January 31, 2025 13:04
Status Failure
Total duration 59s
Artifacts

lint-test.yml

on: push
Matrix: lint+test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
lint+test (8.3, 11.0)
Process completed with exit code 2.
lint+test (8.1, 10.3)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.1, 10.3)
The operation was canceled.
lint+test (8.2, 10.3)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.2, 10.3)
The operation was canceled.
lint+test (8.3, 10.4)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.3, 10.4)
The operation was canceled.
lint+test (8.1, 10.4)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.1, 10.4)
The operation was canceled.
lint+test (8.3, 10.3)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.3, 10.3)
The operation was canceled.
lint+test (8.2, 10.4)
The job was canceled because "_8_3_11_0" failed.
lint+test (8.2, 10.4)
The operation was canceled.