Skip to content

chore(deps-dev): bump tap from 16.3.10 to 21.0.1 #1029

chore(deps-dev): bump tap from 16.3.10 to 21.0.1

chore(deps-dev): bump tap from 16.3.10 to 21.0.1 #1029

Triggered via pull request August 19, 2024 18:43
Status Failure
Total duration 55s
Artifacts

ci.yml

on: pull_request
build  /  prepare-node-matrix
4s
build / prepare-node-matrix
Matrix: build / test
automerge
0s
automerge
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build / test (16)
Process completed with exit code 1.
build / test (20)
The job was canceled because "_16" failed.
build / test (20)
Process completed with exit code 1.
build / test (18)
The job was canceled because "_16" failed.
build / test (18)
The operation was canceled.
build / test (22, experimental)
The job was canceled because "_16" failed.
build / test (22, experimental)
Process completed with exit code 1.