Skip to content

Merge pull request #3 from openedx/feat/channel-integrations #7

Merge pull request #3 from openedx/feat/channel-integrations

Merge pull request #3 from openedx/feat/channel-integrations #7

Triggered via push December 3, 2024 14:42
Status Failure
Total duration 24s
Artifacts

ci.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
tests (ubuntu-latest, 3.8, docs)
Process completed with exit code 1.
tests (ubuntu-latest, 3.8, quality)
The job was canceled because "ubuntu-latest_3_8_docs" failed.
tests (ubuntu-latest, 3.8, quality)
Process completed with exit code 1.
tests (ubuntu-latest, 3.8, django32)
The job was canceled because "ubuntu-latest_3_8_docs" failed.
tests (ubuntu-latest, 3.8, django32)
Process completed with exit code 254.
tests (ubuntu-latest, 3.8, django40)
The job was canceled because "ubuntu-latest_3_8_docs" failed.
tests (ubuntu-latest, 3.8, django40)
The operation was canceled.
tests (ubuntu-latest, 3.8, pii_check)
The job was canceled because "ubuntu-latest_3_8_docs" failed.
tests (ubuntu-latest, 3.8, pii_check)
The operation was canceled.
tests (ubuntu-latest, 3.8, docs)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636