Skip to content

fix: sync issues

fix: sync issues #456

Triggered via pull request March 9, 2025 17:15
Status Failure
Total duration 6m 39s
Billable time 30m
Artifacts

unit.yml

on: pull_request
Matrix: test
unit success
3s
unit success
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test / optimism (1/2)
Process completed with exit code 100.
test / optimism (2/2)
The job was canceled because "optimism_--features__asm-" failed.
test / optimism (2/2)
The operation was canceled.
test / ethereum (1/2)
The job was canceled because "optimism_--features__asm-" failed.
test / ethereum (1/2)
The operation was canceled.
test / ethereum (2/2)
The job was canceled because "optimism_--features__asm-" failed.
test / ethereum (2/2)
The operation was canceled.
test / scroll (1/1)
The job was canceled because "optimism_--features__asm-" failed.
test / scroll (1/1)
The operation was canceled.
unit success
Process completed with exit code 1.