Skip to content

[DO NOT MERGE] Gwyneth diff with reth #5

[DO NOT MERGE] Gwyneth diff with reth

[DO NOT MERGE] Gwyneth diff with reth #5

Triggered via pull request October 17, 2024 14:58
@adaki2004adaki2004
synchronize #3
gwyneth
Status Cancelled
Total duration 4m 31s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
4m 5s
Ethereum state tests
unit success
2s
unit success
Fit to window
Zoom out
Zoom in

Annotations

13 errors
doc tests (optimism)
Process completed with exit code 101.
doc tests (ethereum)
The job was canceled because "optimism" failed.
doc tests (ethereum)
The operation was canceled.
test / optimism (2/2)
Process completed with exit code 101.
test / optimism (1/2)
The job was canceled because "_2_optimism" failed.
test / optimism (1/2)
The operation was canceled.
test / ethereum (1/2)
The job was canceled because "_2_optimism" failed.
test / ethereum (1/2)
The operation was canceled.
test / ethereum (2/2)
The job was canceled because "_2_optimism" failed.
test / ethereum (2/2)
The operation was canceled.
Ethereum state tests
Canceling since a higher priority waiting request for 'unit-gwyneth' exists
Ethereum state tests
The operation was canceled.
unit success
Process completed with exit code 1.